Powered LED work light lamp for construction site
Delivery term:The date of payment from buyers deliver within days-
Price:
Negotiable
- minimum:
- Total supply:
-
Delivery term:
The date of payment from buyers deliver within days
-
seat:
Beijing
-
Validity to:
Long-term effective
-
Last update:
2017-08-08 14:47
-
Browse the number:
81
+
Shenzhen Lsleds technology Co. Ltd
- Contactaixin:
Contactaixin:
lsleds(Mr.)
- telephone:
-
Area:
Beijing
Address:6 Building,Jinhuafa Industry, Qingquan Road, Longhua District, Shenzhen, Guangdong, China (518109)
- Website:
+
Model Number: LS-FLN200-P2276-#5216
Brand Name: Lsleds
Key Specifications/Special Features:
Quick details:Light source: LEDItem type: flood lightsLED light source: Epistar/Bridgelux power/CreeInput voltage: 90-295V AC
Lamp luminous efficiency: 160lm/W
Beam angles: 5, 10, 25, 40, 60, 90, 120°
Working temperatures: -25-55°C
Working lifespan: 80000 hours
Lamp body material: aluminum
IP rating: IP66
power supply driver: Meanwell
Light source: Epistar/Bridgelux power chip
Power factor (PF): ≥0.95
Power efficiency: ≥90%
Working humidity: 10-90% RH
Storage temperature: -40-80°C
Light attenuation (80,000H): 30%
Lamp luminous efficiency: 160lm/W
Beam angles: 5, 10, 25, 40, 60, 90, 120°
Working temperatures: -25-55°C
Working lifespan: 80000 hours
Lamp body material: aluminum
IP rating: IP66
power supply driver: Meanwell
Light source: Epistar/Bridgelux power chip
Power factor (PF): ≥0.95
Power efficiency: ≥90%
Working humidity: 10-90% RH
Storage temperature: -40-80°C
Light attenuation (80,000H): 30%
Saving 80% more energy compare with traditional light source |
We provide not working site lighting LED floodlight open structure design products but also solutions |
Quick response: well-trained and experienced staff will reply all of your inquiries in fluent English in 30 minutes (10 hours between 23:00-09:00 the second day Beijing time) |
Good service: we treat clients as partners, we serve our partners with full responsibility |
Free DIAlux simulating: we can simulate your projects with professional lighting solutions for free |
Shipping Information:
- FOB Port: Shenzhen
- Lead Time: 6 - 9 days
Main Export Markets:
- Asia
- Australasia
- Central/South America
- Eastern Europe
- Mid East/Africa
- North America
- Western Europe